BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//DBIA-MAR - ECPv4.7.4//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:DBIA-MAR
X-ORIGINAL-URL:https://www.dbiamidamerica.org
X-WR-CALDESC:Events for DBIA-MAR
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20230809T073000
DTEND;TZID=America/Chicago:20230809T090000
DTSTAMP:20260405T132457
CREATED:20221220T170320Z
LAST-MODIFIED:20230725T130506Z
UID:7040-1691566200-1691571600@www.dbiamidamerica.org
SUMMARY:Kansas City | Buck O’Neil Bridge: Leveraging the Design-Build Process for a Successful Project
DESCRIPTION:Kansas City’s most significant infrastructure project in a decade\, the new Buck O’Neil Bridge Project will replace the aging existing structure with two new river bridges and a series of approaches and land structures. The project will improve regional and local system performance\, most notably by providing a new\, direct connection from I-35 to US-169 prior to the Missouri River crossing. Built by Massman-Clarkson\, a Joint Venture\, with design by HNTB\, the project is more than halfway complete and scheduled to open in late 2024. \nPanelists:\nMichael Massman\, Deputy Project Manager\, Massman-Clarkson\, a Joint Venture \nJames Pflum\, Project Director\, MoDOT \n  \n  \n
URL:https://www.dbiamidamerica.org/event/kansas-city-program-at-grand-street-cafe/
LOCATION:Grand Street Cafe\, 4740 Grand Avenue\, Kansas City\, MO\, 64112
CATEGORIES:Kansas City,Mid-America Region
END:VEVENT
END:VCALENDAR