BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//DBIA-MAR - ECPv4.7.4//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:DBIA-MAR
X-ORIGINAL-URL:https://www.dbiamidamerica.org
X-WR-CALDESC:Events for DBIA-MAR
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20190617T150000
DTEND;TZID=America/Chicago:20190617T163000
DTSTAMP:20260411T143955
CREATED:20190603T190432Z
LAST-MODIFIED:20190603T190432Z
UID:4317-1560783600-1560789000@www.dbiamidamerica.org
SUMMARY:Blue River Biosolids Meeting
DESCRIPTION:Be a part of history! The City of Kansas City\, Missouri and Carollo/Jacobs\, the Owner’s Advisor\, invite you to an informational meeting to learn about Design-Build and Subcontractor opportunities on the construction of a state-of-the-art Biosolids Process at KC Water’s Blue River Wastewater Treatment Plant. \nPlease plan to come and view the Conceptual Design and learn about the many opportunities to be a part of history with this exciting\, transformational project. The multi-million investment will change the way Kansas City processes its 90 dry tons-per-day of raw biosolids. It will be the first Thermal Hydraulic Process (THP) plant in the Midwest. \nTo RSVP or for more information\, contact Blake Anderson at Blake.W.Anderson@kcmo.org or 816-513-0329. \nClick here for more information. \nWe are seeking Design-Build teams with the following skills: \n\nAsphalt\nBoiler and MAU Installation\nBrickwork/CMU Walls\nBuilding Information Model (BIM)\nConcrete\nConstruction Management\nDemolition\nDesign-Build\nDuctwork\nElectrical\nHVAC Design\nInstalling Process Equipment\nInstrumentation/SCADA\nLandscaping\nPainting\nPlumbing\nProcess Piping\nPumps\nRoofing\nSmoke Stack Demolition\nSolids Processing Commissioning\nSteel and Aluminum Fabrication\nStructural Steel Repairs\nSystems Integration Controls\nUtilities\n\n
URL:https://www.dbiamidamerica.org/event/blue-river-biosolids-meeting/
LOCATION:Blue River Wastewater Treatment Plant\, 7300 Hawthorne Road\, Kansas City\, MO\, 64120
END:VEVENT
END:VCALENDAR